Laserfiche WebLink
trucks. The sandstone was then distributed and reduced <br />through compaction by bulldozers. This process resulted <br />in final lift heights of approximately 4 feet. <br />5. All material appears to have been placed and compacted <br />in accordance with sound industry operating practices. <br />I certify, based upon my field observations and review of the <br />approved Permit C-054-82 for the Carbon Junction Mine, that the <br />fill area was inspected for stability and is being constructed <br />in compliance with Rule 4.09.1 (11)(4) for the critical construction <br />period of the "placement and compaction of fill materials." <br />"rL~/l~(A /I Y~~Lt~( C/ 18/'~ AAMEEA <br />Terry D. ~r v 15082 <br />f' ~ o <br />istered P.E. No. 150~Y~,~_d`~_ -'- <br />TDB/RJR:ga ~ L'F <br />cc: Mr. Jim Hendricks, Pueblo Coal, Inc. <br />