My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP38969
DRMS
>
Back File Migration
>
Report
>
REP38969
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:23:30 AM
Creation date
11/27/2007 8:14:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991082
IBM Index Class Name
Report
Doc Date
5/29/1996
Doc Name
RECEIPT
From
DMG
To
TIGER TIMBER
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br /> <br /> <br />Notice of Intent to Continue Mining Operations <br />110(2) Annual Report C2~rFl~1/F~% <br />T i T i b I ~Y 2 ~~ 1996 <br />ger m er nc <br />M-91-082 <br />Tiger Timber Site* <br />03/17/96 <br />'iv6~On Or ;~inara c 8 Guo~°9Y <br />$225.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: ~~ ~ b. County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? MORE <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during t he report year:* <br />5. Total acres reclaimed for the report year:* <br />6. Total acres in various stages of reclamation:* <br />NdN~ <br />a. Backfilled: h~,~.,• d. Topsoil replaced: neon. <br />b. Graded: ,von . Average topsoil thickness <br />c. Seeded: i~tm.~• replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* ~re.~< <br />8. Estimated total acres to be affected in the next report year:* ~/y ~~~~ <br />9. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your malr**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: c9M~--Q >~>~'~-~ Date: 5- 28'9 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: hkn+Nli Lkucr~-2rz.N Phone: (~'9 ) 7~`f-3~2i <br />Company: T/Gr?2 T +'~' ~g2 <br />Address: PD~ 3ox ~~-g' <br />~AK~ 6~0~~6~, Co SO&27 <br />e c~ <br />NO <br />ESS <br />SS <br />NO <br />aC /e <br />YE'~ <br />'l~r <br />Federal Tax ID No. or Social Security No.: 75/ ~ 29 S 2 O 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.