Laserfiche WebLink
1984 <br />CYCC HYDROLOGIC MONITORING SCHEDULE <br />GROUND WATER <br />MONITOR SITE <br />1. Field Measurement: <br />Bedrock Wells <br />Alluvial Wells <br />Spoils Wells <br />2. Sample Analysis*: <br />Bedrock Wells <br />Alluvial Wells <br />Spoils Wells <br />FREQUENCY <br />JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC <br />1 1 1 1 <br />1 1 1 1 1 1 1 1 1 1 1 1 <br />1 1 1 1 <br /> lA lA <br />1B lA 16 lA <br />lA lA lA lA <br />*See table entitled 1984 Ground Water Analyses <br />