Laserfiche WebLink
Kathy Welt and Christine Johnston <br />Mazch 7, 1997 (DRAFT) <br />Page 19 <br />9. MCC is now designing a larger and improved treatment facility for mine outflow waters. The <br />treatment facility capacity will be increased in phases, in accordance with the needs of the mine <br />water management. Currently, MCC envisions an initial capacity of up to 2,000 gpm. MCC's <br />design will expressly allow for rapid expansion, if necessary. The treatment process will be <br />capable of handling the full range of total suspended solid constituents that MCC has <br />experienced. <br />D:\831-032\300jmk\Technical Memo.doc <br />