My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP38746
DRMS
>
Back File Migration
>
Report
>
REP38746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:22:14 AM
Creation date
11/27/2007 8:10:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977151
IBM Index Class Name
Report
Doc Date
1/3/1983
Doc Name
FN 77-151 GREELEY PIT
From
MLR
To
RAMSOUR BROTHERS INC
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~II II~II~I~~I~~~ ~~~ <br />999 <br />• .,..-/ <br />STATE OFCCLO RADO RiCN>ADD L<bnA 7c. e~~o~ <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman ~~-~e! <br />Denver, Colorado 80203 Tel. (303) 860"-350 <br />David C. Shelton <br />Director <br />January 3, 1983 <br />Ramsour Brothers, Inc. <br />P.O. Box 10 <br />Plateville, Colorado 80651 <br /> <br />xe: File flo. 77-151; GREELEY PIT <br />Based upon our records, the anniversary date of your mining operation permit is <br />January and annual fees for the year(s) 1983 totalling <br />S are due on that date. Fees are based upon a schedule of <br />$350.00 if the operation is an open mining operation of 10 acres or more and <br />$275.00 for any other operation 10 acres or more. <br />• Also, to bring the Division up to date as to the miring and reclamation on the <br />site, please submit a report and map (to a scale of not less than 100' to the <br />inch and not more than 660' to the inch), indicating the phases of the reclama- <br />tion plan which have been completed, correlated with the timetable. The report <br />and map shall contain the folIowinq information: <br />1) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The Location and number of acres in the various stages of reclamation <br />(backfilled, graded, topsoil replaced, revegetated), <br />9) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used and location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br />r~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.