Laserfiche WebLink
TABLE 3 <br />SOUTHFIELD MINE <br />SEMI-ANNUAL SUBSIDENCE MONITORING DATA SUMHARY <br /><MAY, 1990 THROUGH OCTOBER, 1990) <br />THOMPSON RANr_H STRUCTURES <br />and <br />NEWLIN CREEK POINT <br />Survey Date; iU190 <br /> CHANGE FROM ORIC,INAL SURVEY CHANGE FROH PRECEEDING SURVEY <br /> Survey date: S/85 Survey data; 8/90 <br /> HORI20NTAL <br />STATION ELEVATION DISTANCE ELEVATION <br />NO. <br />---------- tFT> <br />-------------- cFT) <br />-------------------- <FT> <br />----------------------------------- <br />THOMPSON <br />RANCH <br />1 O.OS 0.19 0.03 <br />2 0.06 0.11 0.02 <br />3 0.03 O.OS 0.00 <br />NEWLIN <br />CREEK <br />1 -0.07 0.21 0.50 <br />