Laserfiche WebLink
iii iiiiiiiiiiiu iii <br />~tTt'~3E1`t ATi~ ~~Sntlat~5 999 <br />CONSU~TI `IG GcOTECHNICAL ENGINE°_~S P.ND t.IAT.=IAL TE57iNG <br />DAILY FIELD REPORT <br />PROJECT NUMBER D96046MT DATE 5'1 5/96, bVednesday <br />PROJECT NAME Oakridge Energy <br />PROJECT LOCATION Durango, CO <br />CLIENT Goff Engineering <br />CONTRACTOR Durango Construction <br />TECHNICIAN A. Crees <br />WEATHER CONDITIONS <br />Hot and sunny <br />WORK REQUESTED <br />Field Density Testing <br />FOREMAN John Griffith <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the Oakridge Energy project site at 4:15 p.m. I performed field <br />density tests on previously placed and compacted crusher reject material. I left the <br />project site at 5:00 p.m. <br />"Copyright Q by Terra Firma Lo~ul ta~cs, Inc. 1995" All righ c, re ie rve C. <br />P. O. BO%7988 P. O. BO%OOaS 21a gODO DR. <br />ORAND JUNCTION, C081502 MONiROSE.CO B1a02 DURANGO.CO 81701 <br />(307) zas-BSOe t7oa~ zaa2lss t7a1~ zsasoss <br />