Laserfiche WebLink
<br />necessitated, in order to obtain "continuous thin wall (Shelby) tube samples <br />through the zone of the material in question...". <br />b. In order to demonstrate consistency of compaction results throughout the <br />GOB pile, BRL should complete a vertical column density determination in <br />at least three locations on the GOB pile. <br />c. The material that needs to be tested for compaction is in those lifts that were <br />constructed before the first compaction test was performed, on March 5, <br />1998. The figure quoted of "the lower 20 feet of material" came from a <br />visual field estimate by myself on February 24, 1998 and may no[ be <br />entirely accurate. <br />The Division expects that a complete report will be submitted to the Division by February <br />26, 1998. . <br />If you have any questions, please call me. <br />Sincerely, <br />~6seph J. Dudash <br />Environmental Protection Specialist <br />cc: Jim Stover (J.E. Stover & Associates) <br />Larry Routten (DMG) <br />Jim Pendleton (DMG) <br />c:\wp61 \bowie2\goblet5 <br /> <br />