Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />2003 Annual Hydrology Report <br />SP33-6 <br />Terror Creek -Spring/Pond 33-6 <br />Elevation - T680 <br />Depth -1.5' <br />Surface Water <br />• <br />Initiated 10/31/1997 10/37/1997 10/3111997 10/31/1997 <br />Activated <br />Date 11119/2003 9/15/2003 6122/2003 527/2003 <br />UNITS <br />Summary Information <br />Baseline Operation <br />Min Ave Max Min Ave Max <br />Flow GPM 0.00 0.05 0.50 0 0 0 0 <br />FieldComment Damp Dam Damp Damp <br />ph su 7.10 7.17 7.20 <br />ConducGvi umhos/cm 370.00 385.00 400.00 <br />Temperature Celsius 6.90 8.23 9.00 <br />The monitoring point location for SP33-6 is /ocatedjust below the Terror Creek descent road that passes Pond 33-7 and Spnng 33-8 and Spring <br />and Pond 33-5. It is accessed by a short ATV trail onginaGng on the Terror Creek descent road. See Figure 128 for histohcal pond surveillance. <br />• <br />Baseline Information Collection initiatetl on 10/31/97 antl not yet consitleretl complete. <br />Point SP33E has nol been influencetl by mining. F19Ur0 N0. 2 <br />The area of concern for monitoring point SP33-6 has not been eNected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />