Laserfiche WebLink
otice of I.rr}.znt'll'II'lllllllll'll g Operations !~ <br />110_, ,,,~~~va~ neport C JT ~ , lggl <br />Permittee Name: RBK Construction, Inc. ,wined Land <br />Permit No: M-90-106 <br />Operation Name: RBK Pit No. 30 ~eclamationDivision <br />Anniversary Date: 10/16/91 <br />Total: $120.00 (Due on your Anniversary Date) <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? YES <br />Does your mine operate MORE or LESS than 1B0 days per year? MORE ESS, <br />2. Total acres affected during the report year:' .O <br />3. Total acres reclaimed for the report year:` f <br />4. Totai acres in various stages of reclamation:` <br />a. Backfiiled: ~ d. Topsoil replaced: ~ <br />b. Graded: O Average topsoil thickness <br />c. Seeded: G replaced: <br />List species seeded & seeding <br />rate for report year on back <br />5. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:' l~(Ct_, <br />6. Estimated total acres to be affected in the next report year:` ~ <br />7. COMMENTS: <br />Please show the location of the acreage for items 2 - 6 on your map" . <br />Indicate the phases of the reclamation which have been completed, correlated <br />with your timetable. <br />Af r <br />11~~ If there have not been any changes since the last annual report and <br />you previously submitted a map which correctly depicts the current acreage in <br />items 2 through 6, then a new map is unnecessary. However, you must state this <br />fact above-.-- <br />:." <br />c <br />Signatur 0~ C Date: /O~~ ~9l <br />Please type o print cu rent contact name, address, and phone number below: <br />Contact Name: o~tcQ,~., ck`''-et- Phon !1/9 -~dy-338' <br />Company: ~ fl ,c~ ~ ~,,~L. <br />Address: ~ 0 3~ <br />,~~ ,~~0~9 ~ al <br />rl o <br />Federal Tax ID No. or Social Se^urity No.: ~~ G9 g ~ ~d l I <br />