Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2004 Annual Hydrology Report D34-14 <br />• Hubbard Creek -Drainage System <br />Elevation - 6560 <br />Initiated 10131/1997 10/3111997 10/31/1997 10/31/1997 <br />Activated <br />Date 10Y21/2004 8111/2004 6120/2004 5/13/2004 <br />Summary Information <br />Baseline Operation <br />1NITS Min Ave Max Min Ave Max <br />Fknv CFM 0.74 2.55 5.30 WA 5.3 4.3 WA <br />FieldComment <br />ph su 7.0 7.7 8.6 7.8 7.8 8.4 7.9 <br />Conductivity umhos/an 50 161 270 140 180 210 80 <br />Temperature Celsius 1.5 10.0 20.9 7.4 11.0 12.1 4.7 <br /> <br />The location /a the D34-14 monitoring point is on Hubbard seek just below the igneous intrusion noted as Iron Point. The location <br />can be found where a sapling has been painted white. The point where field paremeters were taken did not provide an adequate <br />method to determine flow values. A USGS station is now in place (1109132940) <br />1/ <br />`~ <br />Baseline Information Collection initialed on 10/31/97 antl not yet consitlered complete. <br />Point D34-14 has not been inauenced by mining. ~19Ut2 NO. ~ 00 <br />The area of concern for nonitoring point D34-14 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />