Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2004 Mnual Hydrology Report <br />Surface Water <br />Initiated 1116/1998 111617998 11/6/1998 ttl6/1998 <br />Activated <br />Date 10/15Y1004 8124/2004 6/30/2004 5/1812004 <br />I <br />UNITS <br />Summary Information <br />Baseline <br />Min Ave Maz <br />D33-13 <br />Upper Dove Gulch <br />Elevation - 7560 <br />Operation <br />Min Ave Maz <br />Flow GPM 0.00 0.00 0.00 0 0 0 0 <br />FieldComment D Dry Dry Dry <br />pn au <br />Conductivity umhos/an <br />Temperature Celsius <br />The D33-13 monitoring point is in the upper reaches of Dove Guldr. This monitoring point was added in 1998 by recommendation <br />o/the DMG. <br />Baseline Information Cgllectbn inlUated on 11/6/98 and not yet wnsitleretl complete. <br />Point D3313 has not been influenced by mining. <br />Figure No. 96 <br />The area of ooncem for monitoring point D33-13 has not been a%cted by the mining operation. Therefore, all recorded <br />rrronitoNng events are considered Baseline. <br />