Laserfiche WebLink
• A workover unit was moved onto monitoring well IRI-4 to clean out parted pipe and the <br />quarter inch tubing. Following clean out of the well a compressor was used to blow out <br />the well to evacuate contaminated water, which was a result of the original drilling and <br />completion. Repeated blowing out of this well has brought the water quality close to <br />historic water quality levels. Use of the compressor on this well will continue into 2001. <br />The recompletion of IRI-1 and installation of a new sampler plus access tubing is <br />planned for early summer 2001. <br />4.2 OffSite Facilities <br />4.2.1 Railcar Loadout at Lacv Station <br />• A railcar loadout facility located at Lacy Station, approximately five miles west of Rifle, <br />Colorado, is utilized by a shipping contractor for railcar loading and shipping. <br />4.2.2 Rifle Warehouse <br />A warehouse is utilized in Rifle, Colorado to provide storage of bagged product and to <br />facilitate shipping of product. <br />4.2.3 Corporate Office <br />WRN reports to IMC Chemical at Trona, California with main offices in Overland Park, <br />Kansas. <br /> <br />14 <br />