Laserfiche WebLink
Bowie No. 2 Mine Subsidence <br />Oct-Nov 2002 Survey <br />LINE-21 <br />STA Date Node # Northing Fasting Elevation Description <br />21-A 2002 1807 33409.25 33745.55 7592.15 REBAR-CAP <br />21-B 2002 1808 33020.48 33791.01 7612.54 REBAR-CAP <br />21-C 2002 1809 32731.09 33892.26 7616.58 REBAR-CAP <br />21-D 2002 1810 32335.70 34043.25 7628.56 REBAR-CAP <br />21-E 2002 1811 32029.19 34230.00 7647.77 REBAR-CAP <br />LINE-22 <br />22-A 2002 1812 31620.41 34693.00 7666.57 REBAR-CAP <br />22-B 2002 1813 31502.82 35198.41 7647.75 REBAR-CAP <br />22-C 2002 1814 31361,34 35663.00 7595.83 REBAR-CAP <br />22-D 2002 1815 31315.04 '35950.93 7589.81 REBAR-CAP <br /> <br />LINE-23 <br />STA Date Node# Northing Fasting Elevation Description <br />23-A 2002 1883 32974.71 36813.58 6525.06 REBAR-CAP <br />23-B 2002 1884 32699.51 36979.08 6561.10 REBAR-CAP <br />23-C 2002 1885 32581.72 37160.23 6521.97 REBAR-CAP <br />22 <br />