Laserfiche WebLink
Bowie No. 2 Mine Subsidence <br />Oct-Nov 2002 Survey <br />J <br />• <br />L J <br />LINE <br />STA Date Node # Northing Easting Elevation Description <br />8-A 2000 814 26864.84 31885.69 7737.83 REBAR+CAP <br /> 2001 1125 26864.63 31885.99 7735.81 <br /> 2002 1734 26865.60 31886.20 7734.44 <br />8-B 2000 815 26652.9D 31855.04 7700.90 REBAR+CAP <br /> 2001 1126 26652.74 31855.90 7697.25 <br /> 2002 1735 26653.60 31856.16 7696.32 <br />8-C 2000 816 26479.34 31822.90 7655.12 REBAR+CAP <br /> 2001 1127 26479.35 31823.67 7650.66 <br /> 2002 1736 26480.06 31823.99 7650.10 <br />8-D 2000 817' 26162.20 31873.49 7599.68 REBAR+CAP <br /> 2001 1128 26162.76 31874.08 7597.54 <br /> 2002 1737 26163.28 31874.26 7597.29 <br />Change in position: 2001->2002 <br />POINT # SURVEY # <br />2001-2002 BEARING DISTANCE ELEV <br />8-A 1125-1734 N 12°11'29" E 0.99 - 1.37 <br />8-B 1126-1735 N 16°55'30" E 0.90 - 0.93 <br />8-C 1127-1736 N 23°46'55" E 0.77 - 0.56 <br />8-D 1128-1737 N 19°11'00" E 0.56 - 0.25 <br />10 <br />