My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37837
DRMS
>
Back File Migration
>
Report
>
REP37837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:17:15 AM
Creation date
11/27/2007 7:53:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
8/20/1985
Doc Name
BLUE RIBBON MINE BENCH INSPECTION CERTIFICATION QUARTERLY REPORTS - FEBRUARY THROUGH APRIL AND MAY
From
MLRD
To
SUE MOWRY
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiuiii <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTO N, Director <br />Richartl D. Lamm <br />Governor <br />DATE: August 20, ]985 ~"'"" <br />T0: Sue Mowry <br />FROM: Jim Pendleton ., c-r.~Q"~- <br />RE: Blue Ribbon Mine Be~rEh In ction Certification Quarterly Reports - <br />February through A and May through July, 1985 (Permit C-81-047) <br />Pursuant to your request, I have reviewed the above-referenced mine bench <br />inspection certification reports. The reports are acceptable as submitted. I <br />recommend that we inform the operator of the following conditions. <br />• <br />1. The monitoring of the temporary and permanent slope stability <br />monuments should be performed at lease monthly for the first six <br />months. The Division should be informed immediately if any <br />significant movement is noted. <br />2. The remaining work on the mine bench reconstruction: placement of <br />"the cover (material), completion of the rock toe, seeding and <br />installation of the four (permanent) stability monuments at the top <br />of the bench," must be completed prior to the end of this fall's <br />construction season. The Division expects this work to be <br />completed this fall: If the applicant procrastinates and is <br />interrupted by the onset of cold weather, a violation situation <br />will exist. The operator should proceed accordingly. <br />cc: Bob Liddle <br />2808E/cj <br />• <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.