Laserfiche WebLink
2.3.3 Reclamation Activity <br />Seedinu <br />Topsoil stockpile, pipelines and disturbed areas were seeded <br />October - November, 1990. Areas seeded include: <br />Acres <br />a. Process area soil stockpile 4.0 <br />~ b. Production well NaTec 26-90-5 and water well <br />Na 26-90-1 soil stockpiles. 0.6 <br />c. Monitoring well pad at Na 26-IRI-1. 0.2 <br />d. Water supply pipeline 0.1 <br />e. Abandon access road 1.5 <br />f. Natural gas pipeline (total disturbance). 6 <br />~ ~ g. New access road (total available) l0 <br />Total 22.4 <br />See Figure 2-4 for areas reclaimed. <br />Seed Mixture <br />The approved (BLMJCOlorado Mined Land Reclamation) seed mixture <br />was broadcast at a rate (23.9 1bsJacre) double the drilled rate <br />per the mine plan. Pure live seed was the basis for calculation <br />of seed rate. Table 2-2 lists species seeded. <br /> <br /> <br />24 <br />