My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37836
DRMS
>
Back File Migration
>
Report
>
REP37836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:17:15 AM
Creation date
11/27/2007 7:53:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Report
Doc Date
12/31/1990
Doc Name
THE 1990 PROJECT STATUS AND ANNUAL PLAN OF DEVELOPMENT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Process Water Treatment and Storage <br />All water used directly in the mining, crystallization and surface <br />cooling operations must be treated to remove hardness. The raw <br />water will be softened in a water softener unit to remove calcium <br />and magnesium ions The softener includes a common brine tank to <br />regenerate the resin beds. <br />Softener regeneration wastes drain to the waste water pond. To <br />minimize the water load on the waste pond, softener production <br />will be minimized. <br />The softened water is stored in a 72,000 gal carbon steel tank <br />located in the process tank farm. A 100 gpm process water pump <br />• distributes process water to the plant users. <br />Potable Water Supoly <br />Bottled drinking water will be supplied from off-site. Process <br />water (softened) is to be supplied to showers, toilets, sinks, <br />safety showers and other services normally considered "potable". <br />These systems will be piped such that a potable water treatment <br />system can be added at a later date. <br />Domestic Sewage Disposal Svstem <br />The criteria for design of the sewage disposal system was based on <br />Colorado Department of Health guidelines. A total of 27 personnel <br />(office/plant) were utilized to calculated daily sewage flow of <br />• 720 gpd. Holding tank capacity is 1000 gallons and absorption <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.