My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-03_REPORT - M1983035
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1983035
>
1996-05-03_REPORT - M1983035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 9:46:27 AM
Creation date
11/27/2007 7:53:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Report
Doc Date
5/3/1996
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUALFEE/REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•. APR 01 '96 02:01PM DIOIMERALq&CEOL0iY • P.3/3 <br /> Notice of Intent to Continue Mining Operations <br /> 112 Annual Reno t <br /> Permittee Name: Schmidt construction Company <br /> Permit No: M-83-035 <br /> Operation Name Vollmer Pit* <br /> Anniversary Date: 05/12/96 <br /> Total: S550.00 (Due on your Anniversary Date) <br /> 1. a. Permitted acreage: b. County where mine is located: <br /> 2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE Or LESS than 180 days per year? MORE LESS <br /> 3. Does this mine have a phased reclamation plan? YES NO <br /> 4. Total acres affected during the report year:* <br /> 5. Total acres reclaimed for the report year:* <br /> 6. Total acres in various stages of reclamation;* <br /> a. Backfilled: d. Topsoil replaced: <br /> b. Graded: Average topsoil thickness <br /> c. Seeded: <br /> replaced: <br /> List species seeded 6 seeding <br /> rate for report year on back <br /> 7. The type and approximate quantity of fertilizers, organic material or Boil <br /> conditioners used for the report year:* <br /> B. Estimated total acres to be affected in the next report year:* <br /> 9. COMMENTS: <br /> • Please show the location of the acreage for items 4 - 6 On your map**. <br /> Indicate the phases of the reclamation which have been completed, correlated with <br /> your timetable. <br /> •• NOTE: if there have not been any changes since the last annual report and you <br /> previously submitted a map which correctly depicts the current acreage in items 2 <br /> through 6, then a new map is unnecessary. However, this must be stated above. <br /> signature: Date: <br /> Please type or print current contact name, mailing address, and phone number <br /> below: <br /> Contact Name: Phone <br /> FAX NO: ( 1 <br /> Company: <br /> Address: <br /> Federal Tax ID No. or Social Security NO. : <br />
The URL can be used to link to this page
Your browser does not support the video tag.