Laserfiche WebLink
<br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date: <br />Please complete the <br />reclamation data. <br /> <br />~~~~1~~2 En® sure <br />Bar 70 Enterprises Inc FEB 221988 <br />M-77-132 <br />Berry Pit MINED LAND <br />O1 /16/88 RECLAMATION DIVISION <br />following and return this form with your fees and <br />Enclosed are: (Check space(s) below) <br />X Check or money order payable to Colorado Mined Land Reclamation <br />Division for annual fees due <br />X Annual Report <br />x Map <br />Remarks: During 1987 the working face of the pit rer:ained essentially: the same as <br />from the 1 n consTS e o a emp n9 mar .e exls ino <br />stockpiles and completing reclamation work. Reclamation eiork completed during <br />e comp a ion o e ac i nra lnn an rep acemen o onsoil <br />in the area indicated as Phase I in the enclosed map. Reventation !•:as commenced <br />In e a o omp e e a al s on e revege a lop are no avaT a e <br />as of the date of this report. Additional information v:ill be forwarded to you <br />within the next thirty (301 davs. As to Phase II of the reclamation work <br />except for an area to maintain stockpiles and sufficient area for mining <br />this area will be forwarded to you !•:ithin the next thirty (30) days. <br />During 1938 it is not anticipated at the present tune that any additional <br />areas will be disturbed. Present stockpiles are sufficient to handle anticipated <br />demand in the cpmin~,yaar. It is alcn anticiOa±Pd that th final topsoil <br />replacement and revegetation will be completed early in the Spring for all of <br />Phase T anri Phase iT evrant ac oihat is minimally naceccar~ to maintain room in <br />the pit for operations and stockpiles. <br />Accurllte ma~nin9 is not availahla at the nrasent time dug fn inaccesSibillty <br />to the pit because of heavy snow cover. <br />BAR 70 ENTERPRISES, INC. <br />By <br />Signature Kent A. Borchard, Attorney in Fact <br />(Rev. 02/87) <br />5257E <br />