Laserfiche WebLink
.~ ;-, <br /> <br />iii iiiiiiiiiiiiiiii <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Date: <br />ew ~~lc <br /> <br />I~~ <br />Waste Bank No: .St DiS <br />General Description or Reference to Site Plan: <br />^ Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />New Elk -Exhibit 30, pages 2.05-27 through 2.054 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />^ Placement of Underdrain(s)` <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/or discharge, integrity of 100-year24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />ivo a rG s e-{'ac ~; ve .S~epQse we ~ o .6.s~ri~1. <br />Reco.lsy~c•F;o-+ 0~'607`~ S~b/~.~rY-;r,s cras co•tip/rf~+•/ Pr:or><o or.r,.,S~ <br />~e~o 6/on~ct ><ypcdrvr%, l,~/ 6~e.+ i~p/o~rd w1~1~ r;p•rvp. leap-~Pp <br />vPP~P9re~t ~~ be vii a 7`0 3 ~~,~ c/,'vyr~4,a-~, D~o;~s h.i// <br />bt' o~c-rues/ ~n hfoft! d~Y.~,'; l ~ar;ng ~~a.t-7`Quo~e/1~. inS~Y7t;6•~, <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />Sone Minor 5~~,^y 4ssoc;p~o/ h.,~ /'eco./s~rc,r~o,,, p7n <br />~e d~;ns ~~d ~~, P/q«. <br />Job No. 28,170 Page 1 of 2 <br />