My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37492
DRMS
>
Back File Migration
>
Report
>
REP37492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:16:26 AM
Creation date
11/27/2007 7:47:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
3/16/2006
Doc Name
2004 & 2005 Annual Reclamation Report
From
Bowie Resources, LLC
To
DMG
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
During the year 2001, Che Bowie No. 1 West Mine continued to be reclaimed. At the end <br />of the 2001 reporting year. Bowie Resources Ltd., had completed approximately 80 <br />percent of the backfilling. Topsoil located on the fill outslopes was moved to a temporary <br />storage location during the backfilling process. The West Mine V"entilation Shaft was <br />filled dining this same period. <br />The Bowie East Mine reclamation during 2001; consisted of demolition and removal of <br />permanent structures. The following structm'es were removed: bathhouse/office, storage <br />tanks, MCC buildings, fire house, belt structures, transfer towers, shop/warehouse, rite <br />shop, loading bin, fire house, belt structure; the majority of the 2.000 ton bin, guard <br />shack, sewage treatment plant, crushing and screening plant, u~uck loadout, and stacking <br />tube. <br />For the reporting year 2002, Bowie Resources Ltd., continued with the reclamation of the <br />Bowie No. 1 y~/est Mine Site. Reclamation consisted of distributing and grading of nearly <br />49,000 yrds of subsoil and topsoil back to its approximate original contour. Two new <br />sedimentation control ponds have been established near the bottom of the reclaimed uea. <br />Upon completion of the grading, the entire area was hydro-seeded with the approved <br />permanent seed mix and using a cellulose mulch at a rate of 1,500 pounds per acre and a <br />tackifier at 100 pounds per acre. In conjunction with the hydro-seeding a fertilizer was <br />applied aC a rate that applied at ]east 30 pounds per acre of nitrogen and 60 pounds of <br />phosphorus. <br />During this reporting period the ventilation shaft located at the Bowie No. 1 WestMine <br />was re-filled due to settling. Approximately 2,500 yrd3 was placed into the shaft As <br />required by the Mine Safety and Health Administration, CFR 30 Part 75.1711-1 beginning <br />from the bottom of the coal seam and extending upward for a distance of 150 feet, the <br />shaft was filled with non-combustible material. The remaining portion of the shaft was <br />filled with other available material. <br />Reclamation of the East Mine consisted of completing the demolition of permanent <br />structures located on the Old Fan Level, Office/Bathhouse Level, and crushing and <br />screening level. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.