Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamatio~nl Report for the Year ,7ooy <br />(~wro ~~ I _' cg~ b38 /~~ym ~saur'cvoy/1C <br />mine name permit # Permittee <br />Address: <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upgrtAR 1 G 2006 <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other 1.1 <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accuratel~.v~,~on of Minerals and o.war <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed l5'S• ~ + d = ~ S Jr• <br />Acres backfilled and raded q <br />.58. <br />/ + Q = ~• 9 <br /> <br />Acres to soiled 6 <br />~?• / <br />+ <br />Q <br />= 0 <br />`J-.5• <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears ' <br />Acres seeded` [ <br />5 ~ • 9 + ~ = 55• ~ _ /$• 7 + yo. a <br />'include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the total number of acres disturbed 155• l and the total number of acres: <br />Phase I released l~ Phase II released O Phase III released ~ <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N• ~. <br />For Government Performance and Results Act /}I <br />Acreage in long-term mining or reclamation facilities z '7 tp •a <br />Acreage in active mining areas a~_ <br />'(exclude acres where Phase III release has been achieved) <br />' Incudes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpYes; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackflled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow flls, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposa! areas). <br />' Includes pits, topsoil stripped areas in atlvance of pits, and spoil not backflled and graded <br />