.. • <br />Those areas noted as backfilled are active raw oil shale dump areas. <br />Those graded areas are active mine support areas and are stabilized with water <br />and dust palliative. <br />4. The species of vegetation planted, the locations, and approximate dates of <br />planting.... <br />Locations - Described above under revegetated areas. <br />Approximate date - All areas were seeded in September and October, 1981. <br />Vegetation planted - All areas were seeded with permanent seed mixture <br />(Table 2). Planting of shrubs is scheduled for 1982 and, in fact, 500 <br />have been planted to date. <br />5. Fertilization of areas revegetated in the fall of 1980 (approved <br />right-of-way road improvements) Bl through B10 location -see map Exhibit <br />E (Revised), also note (Table 1) item number 23. These areas Scheduled <br />for fertilizing two (2) years following seeding. Therefore, these areas <br />will be fertilized this fall. <br />6. Evaluation of revegetated areas is planned for the third growing season on <br />areas of at least one acre. Seedings have not been established long <br />enough to meaningfully evaluate. <br />7. Under the present plan for 1982 no additional disturbances are <br />anticipated. <br />In summary, the above points 1-7 cover reclamation activities in 1981. <br />The following map and tables are provided for additional information. <br />Also included is a summary update. <br />1. Summary update <br />2. Logan Wash Disturbed Areas Map - Exhibit F (Revised) <br />3. Table 1, Estimates of Acreages Disturbed and Acreages Revegetated <br />4. Table 2, Species List for Logan Wash <br />Summary update of Exhibit E of the Reclamation plan as a result of <br />activities onsite for 1981: The following summaries are provided as <br />updates to t ose previously provided, for the identified areas. <br />Summary Area !~1 <br />The dump presently encompasses 13.36 acres in size. No benches have been <br />constructed. Three erosion control structures have been constructed in <br />Dry Gulch (at the anticipated maximum reach of the toe of the dump) and <br />the fourth structure has been designed but, will not be installed unless <br />the need is apparent. <br />During a heavy precipitation event there was a flow of mine muck into a <br />previously undisturbed area, but within the approved mine dump area. The <br />muck flow has been contoured to provide that any runoff will go to the <br />erosion basins. <br />Construction of the erosion control basins and the mine muck flow is a net <br />increase of 1.00 acre, which brings the total disturbance of Area #1 to <br />13.36 acres. <br />