{ Permittee Name: ~ewood Brick and 7yTe Co. ~ Page 2 <br />~ Permit No: M-79-045 <br />Operation Name: Church Pit <br />Anniversary Date: 02 / 28 / 95 <br />1 (cont.) <br />Gravel - Jefferson County Road and Bridge Dept. is still <br />mining the gravel under a lease with the mineral right owners. <br />Gravel mining continued in Stage I & II ahead of the clay <br />operation, basically over the clay beds (blue). This is done <br />in accordance with the approved plan and serves to strip the <br />clay vein of material that we consider overburden. The <br />current gravel operation has disturbed 11.58 acres ± in the <br />mine. The amount of minable material left over the clay seam <br />is such that they began mining in Stage A on the south this <br />year (orange). The area over the clay seam is use as a <br />processing plant site to avoid disturbing any more area. The <br />area stripped in Stage B (orange) will become part of the new <br />plant when the gravel piles are removed from the clay seam. <br />(2) No reclamation was required this year. None will be required <br />until mining for both materials is completed in any given <br />stage. We began to remove part of pre-law overburden pile on <br />the southwest side of the facility this year (green). In <br />addition, we began to fill in the north slope of the old clay <br />pit to establish the slope into the excavation area. <br />(3) Clay - Mining will continue is Stage I, no new area will be <br />disturbed this year because we are mining in the area stripped <br />by the County. We will mine deeper into the clay veins <br />exposed in the past and advance the face to the north as more <br />of the clay vein is exposed by the gravel operation. This may <br />mean we move into the southern end of Stage II. Processing <br />will continue in the Plant Site Area in Stage 0, 3.38 ac. ±. <br />Gravel - Mining/stripping will continue in Stage II on the <br />north end of the clay operation. The sand and gravel operator <br />has disturb most of the area in Stage II above the clay vein <br />and will concentrate on mining to the top of the clay vein. <br />Sand and gravel will continue to be mined in Stage A this year <br />and the Plant Site may be relocated off the clay seam this <br />year. The material left on the clay seam is lower quality <br />than expected and material from Stage A has to be blended with <br />it to make an acceptable product. <br />(4) No reclamation is called for during the next year. However, <br />if the gravel operator reached the north permit line a <br />section of sloping will be completed from the existing surface <br />to the top of the clay vein. This slope will be part of the <br />north slope into the floor of the pit. We will continue to <br />work on the north slope of the old clay pit and may begin to <br />do sloping on the east slope if the gravel operator removed <br />the overburden pile next to the face on that side. If the <br />opportunity to sell this overburden continues we will be <br />working on the southwest overburden pile as well. <br />