Laserfiche WebLink
Additional Page <br />2005-2006 Annual Report <br />Table Mountain Quarry <br />M-1999-004 <br />Continental Materials <br />(Castle Concrete Company) <br />Anniversary Date: June 25 <br />Overview of Year: During the 2005-2006 permit year, activity here has remained steady. Material was <br />taken from both the BLM and State lands, with more of the material coming from the State side. The <br />material that is taken from the State land and from the BLM land are weighed separately when the rock is <br />shipped. This allows monitoring of the proper royalty payments, Reclamation has continued at the site and at <br />this time a southeastern portion of the current mining area is in process of reclamation. Areas that have been <br />reclaimed in the past have shown very good development. <br />Affected Land: The amount of affected land stands at about 28 acres with 8 acres in actual mining (6.5 <br />acres on State land and 1.5 acres on BLM land). <br />Reclamation: Reclamation is currently in progress on a southeast section of the state land mining area, <br />which is depicted on the map. Areas of reclamation that have been completed in the past are coming along <br />quite well with very good growth established. <br />The moderate infestation of knapweed that was talked about in last years annual report was sprayed <br />in late spring of 2005 and again in spring of 2006. The spraying has seemed to help keep the infestation <br />isolated and this year's application will aid in further control and eventually eradication. <br />Anticipated Activity in 2005-2006: Activity in the next year will be divided between the State land and <br />the BLM land. Reclamation will continue in the southeast section. Noxious weeds will be monitored and <br />sprayed as needed. <br />Continental Materials 2003-2004 Annual Report M-1999-004 Table Mountain Quarry Page 1 of 1 <br />