Laserfiche WebLink
<br />COLOWYO MINE Page 1 <br />Sta [ion: LGSC <br />Sample Range: Through 12/31/00 <br />Samp Le Flow <br />Date Ra[e <br />cfs <br />04/0]/82 N <br />09/23/82 N <br />05/25/82 N <br />06/14/82 6.090 <br />06/25/82 9.]00 <br />0]/06/82 3.800 <br />0]/12/82 3.200 <br />0]/19/82 2.400 <br />0]/26/82 2.]00 <br />08/02/82 2.390 <br />08/09/82 1.940 <br />08/16/82 1.0]0 <br />08/23/82 0.820 <br />08(30/82 0.820 <br />09/01/82 0.]00 <br />09/1]/82 1.]60 <br />09/21/82 0.]00 <br />09/28/82 1.520 <br />10/06/82 1.160 <br />10/11/82 0.940 <br />10/21/82 0.]10 <br />12/02/82 N <br />12/16/82 N <br />01/18/83 N <br />03/29/83 N <br />05/05/83 N <br />06/15/83 N <br />0]/06/83 11.130 <br />0]/14/B3 6.930 <br />07/25/83 7.670 <br />08/01(83 ].220 <br />08/09/83 4.900 <br />08/19/83 3.960 <br />08/26/83 3.230 <br />09/02/83 3.010 <br />09/09/83 3.630 <br />09/16/83 N <br />09/23/83 N <br />09/27/83 N <br />10/04/B3 N <br />10/12/83 N <br />10/19/83 N <br />10/20/83 N <br />10/2]/83 2.220 <br />11/18/83 9.450 <br />12/12/03 N <br />03/13/84 N <br />04/30/89 N <br />OS /31/84 N <br />No[e: N -a No measuremen[ <br />