My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37081
DRMS
>
Back File Migration
>
Report
>
REP37081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:46 AM
Creation date
11/27/2007 7:40:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Report
Doc Date
2/25/2005
Doc Name
2004 Annual Hydrology Report Cover Letter & Table of Contents
From
Seneca Coal Company
To
DMG
Annual Report Year
2004
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
temperature, and electrical conductivity [ECJ). NPDES Discharge Point <br />012 is monitored weekly for flow and pH. All four NPDES sites are <br />monitored monthly for NPDES parameters and field parameters. Samples <br />obtained at these stream and NPDES sites are analyzed for the surface <br />water parameter list, Table 8, during April, May or June, and September. <br />Spring sites are monitored in the spring and fall seasons. The current <br />surface water and spring monitoring program is presented in Table 15-9 <br />of the Yoast Mine PAP. <br />All surface water data collected during this reporting period are <br />provided in Appendix D. Data for each site begins with a flow hydrograph <br />of all historic data (plus an annual hydrograph for NPDES sites), <br />followed by a listing of individual water quality and quantity data for <br />the current water year, followed by remarks if present. This is followed <br />by a TDS regression plot using the LOWESS method (see the Ground Water <br />Quality section), and a listing of historic percent milliequivalent <br />values for major ions and TDS values. A statistical report representing <br />baseline (i.e., premining) data for each site downstream of mining (when <br />available) is provided in Appendix D1. On this statistics report, <br />"censored data" refers to analytical values that were below the <br />detection limit, which were censored £rom the min/max/mean calculations. <br />The time frame for baseline conditions is listed under "conditions <br />specified" at the bottom of each page. <br />Sage Creek <br />- Site YSSF3. This site exists on Sage Creek upstream of all potential <br />Yoast Mine discharges. This year, this site stopped flowing in August. <br />It displays a stable TDS trend. <br />- NPDESI2. Mining in this basin began in 2000. Reconstruction of the <br />water augmentation Pond Y1 (Site YSSF2) was completed on September 13, <br />1999. It is now referred to as Pond 012 (NPDESI2). This pond began to <br />flow again (after reconstruction) in April 2000. The average flow value <br />for this year is 0.064 cfs, which is 93~ of the historic (2000-2004) <br />value for Pond 012, 0.069 cfs, but only 50~ of Pond Yl's historic (1991- <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.