Laserfiche WebLink
<br />1 <br />' September 28, 1998 <br />SECTION 01010 ~ <br />SUMMARY OF WORK <br />PART 1 GENERAL <br />1.1 DESCRIPTION <br />ITEC Environmental Inc. (ITEC) is planning the revitalization of the existing Gold Hill facility, <br />' located near the community of Gold Hill, approximately nine miles west of Boulder in the Gold Hill <br />mining district, Boulder County, Colorado, in order to facilitate reprocessing of waste rock <br />accumulated at the Cash Mine, near the mill. The first phase of site redevelopment for the project, <br />' which is intended to provide interim capacity for start-up activities, will involve: <br />Construction of an upstream raise to the existing tailings impoundment <br />embankment. The volume of material to be placed and compacted for the <br />' embankment raise is estimated to be 8500 cubic yards (cy). <br />Installation of a Geosynthetic Clay Liner (GCL) and a 60 mil High Density <br />Polyethelene HDPE Liner within the limits of the tailings impoundment, including the <br />upstream face of the embankment. <br />These components of the project will be constructed and operated under the provisions of <br />' the existing permit for the Gold Hill Mill, as amended by a Technical Revision addressing the <br />specific components of the proposed site redevelopment. Construction of the Phase 1 <br />redevelopment components is scheduled to begin during August, 1998 and be completed by the <br />t end of September, 1998. <br />Subsequent phases of the project will include construction of 1) a larger tailings <br />' impoundment to accommodate full-scale production; 2) a process water storage impoundment; 3) <br />upgrading of the haul road from the Cash Mine site to the Mill; and 4) relocation of the access road <br />across the northern region of the operations area to accommodate development of the ore storage <br />area and process water pond. Components of subsequent phases of the project will be constructed <br />' either under the provisions of existing permits, amended as necessary by Technical Revisions, or <br />under newly acquired permits. <br />' 1.2 DEFINITIONS <br />The following definitions shall apply to the Technical Specifications: <br />A. Owner The Owner is the person, firm, or corporation identified as ITEC <br />Environmental Colorado Inc. The term Owner means the Company or its authorized agent or <br />' representative, as designated to the Contractor and Engineer in writing. <br />B. Contractor The Contractor is the person, firm or corporation identified as such by <br />' the Owner. The term Contractor means the Contractor or his authorized representative, as <br />designated to the Owner in writing. <br />' Summary of Work <br />' J\6C61lSPECSFNL WPO 01010-~ <br />