My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37060
DRMS
>
Back File Migration
>
Report
>
REP37060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:42 AM
Creation date
11/27/2007 7:39:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980201
IBM Index Class Name
Report
Doc Date
9/23/1992
Doc Name
RECEIPT
From
MLRD
To
MATHIAS CONCRETE
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f •1 <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br /> <br /> <br />Notice of Intent to Continue Mining Operations <br />112 Annual Report <br />Mathias Concrete Inc <br />M-80-201 <br />O'Bannon Pit* <br />10/23/92 <br />$490.00 (Due on your Anniversary Date) <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? YE5 <br />Does your mine operate MORE or LESS than 180 days per year? MORE <br />2a. Financial Warranty: $ 2 2b. Permitted acreage: <br />3. Do you have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year: * yt,v.y,°°,,,;,,o„_g-?"`r.,oL /~_-` <br /> <br />5. <br />Total acres reclaimed * <br />for the report year: 17t•St-uh~ist. <br />'/ <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: c ~ d. Topsoil replaced: Ike <br />b. Graded: c• Average topsoil thickness <br />replaced: ~~~' <br />c. Seeded: (,cG• <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* ~~i/ <br />8. Estimated total acres to be affected in the next report year:* $~ ~'Pjw.o_. <br />9. COMMENTS: ~nr15 AeVw~if";/as CoNJev,~~ -ova`., ~ /tD //Z <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NQIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: s+~ Date: 9 z~ ~l'Y <br />Please type or print current contact name, mailing address, and phone number below: / <br />Contact Name: ~~o••.as (v'-L~1~~F~i4s hone: ~`J/4> ~st-39SZ <br />Company: ~a ¢G~i s r oar •,~~..~ <br />Address: ~X 2GL <br />Nnd~~~ u; sty . ~ ~~~~~ ~a~`q,~ <br />Federal Tax ID No. or Social Security No.: ~y - os~ ~ ~ 7 %` <br />Steed -! v~ ins ou~._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.