My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP37033
DRMS
>
Back File Migration
>
Report
>
REP37033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:15:40 AM
Creation date
11/27/2007 7:39:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Bayshore Ponds Trench Elevations
From
Carma Bayshore
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF SLURRY WALL TEST <br />Report Number: 25045300.0013 <br />Service Date: October 30, 2006 <br />l~~rr~con <br />10525 West I-70 Frontage Road North <br />Wheat Ridge, Colorado 80033 <br />(303) 42&3300 <br />Attn: Tyler Packard <br />188 Inverness Drive West <br />Ste 150 <br />Englewood CO 80112 <br />Services: <br />Report Date: November 08, 2006 <br />Project: Saint Vrain Site Slurry Wall <br />I-25 Frontage Rd 8 County Rd 28 <br />Longmont, CO <br />Project No : 25045300 <br />Terracon arrived on-sfte to observe slurry wall construction operations. Field activities included <br />morning testing of the bentonite slurry at the mixing station and at the trench (station 17+30). <br />Each sample was tested for viscosity, unit weight, and sand percentage by volume (trench samples <br />only). Morning testing of the soil bentonite backfill-was conducted at station 16+40. The sample <br />was tested for slump and unit weight Trench depth measurements (both to key and total) were <br />performed at station 17+90, with a sample collected. Test results and measurements are presented in <br />the attached report. <br />Terracon was notified at 12:30 PM by Steve with Geo-Con that a hole in the gasoline supply line was <br />created at station 18+00. Terracon left Bay Shore Ponds for one hour, when Terracon arrived on-site <br />at 1:00 PM, Terracon observed gasoline on the surface of slurry trench approximately from station <br />• 17+90 through station 18+20. At about 1:30 PM, Jim Papstein area manager with Rocky Mountain <br />Pipeline and Paul Henahan with Fremont Environmental arrived. Fremont Environmental contained the <br />gasoline from station 16+20 through station 18+50. At 3:40 PM gasoline was observed passing through <br />the containment area at stations 16+20 to 18+50. Plan of action as of 4:00 PM was to vac gasoline <br />from slurry trench, and continue slurry trench construction from station 18+80 in order to displace <br />slurry to allow Rocky Mountain Pipeline to proceed with repairs. Slurry wall construction is to <br />continue through the night. Terracon will observe slurry the following AM shift for any product <br />that may stilt be present in trench. <br />Terracon Rep: Timothy M. Zieschang <br />Report Distribution: <br />r• <br />Reviewed by: //~ r <br />Raymond L. Denton <br />The tests were performed in general aaArdance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full w8hout the written consent of our company. Teat results transmitted hereto are ony applicable <br />to the actual samples tested at the location(s) referenced and are not necessady indicative of the properties of other apparentty similar or identicel <br />materials. <br />Page 1 of 1 .,,,. w. <br />
The URL can be used to link to this page
Your browser does not support the video tag.