Laserfiche WebLink
RECEB~!IF® <br />NOTICE OF INTENT TO CONTINUE MINING OPERATIONS <br />110 (2) Annual Report FEB 2 t 2006 <br />Permittee Name: Rudy Fontanari <br />Permit No: M-8~--002 <br />Operation Name: Whitewater Quarry* <br />Anniversary Date: 02/26/93 <br />Total: $175.00 (Due on your Anniversary Date) <br />mwsm. m ~+~~~~ua~s and Geology <br />1. Has this mine been granted TEMPORARY CESSATION STATUE? YES <br />Does this mine operate MORE or LESS than 180 days per yeaz? MORE ES5 <br />2a. Financial Warranty: $ JS"),p, ' 2b. Permitted acreage: 9 <br />--` "- "-'3:"--Roes "this mine have a phased reclamaTion'pl'an-?~` - - - -'-~'T;S- <br />4. Total acres affected during the report year:* ~ ~.~,, <br />5. Total acres reclaimed for the report yeaz:* -~P <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: „2 d. Topsoil replaced: <br />• Average topsoil thickness <br />b. Graded replaced: <br />c. Seeded . <br />List species seede & seeding <br />rate for report yeaz on ack <br />7. The type and approximate quantity of fertilizers, organic material or soil conditioners used <br />for the report yeaz:* ~~,,e <br />8. Estimated total acres to be affected in the next report yeaz:* ~ P <br />9. COMMENTS: <br />Please show the location for the acreage for items 4 - 6 on your map**. Indicate the phases <br />of the reclamation which have been completed, correlated with your timetable. <br />**NOTE: If there have been any changes since the last annual report and you previously <br />submitted a map which correctly depicts the current acreage in items 2 through 6, then a new <br />map is unnecessary. However, this must be stated above. <br />Signature:~~,-~~ ~ Date: ~,2- / `~- ~ <br />Please type or pr~rrent contact name, mailing address, and phone number below. <br />Contact Nance: <br />Phone: (~9~> .~'3<J- ~9~/FT <br />Address: <br />