Laserfiche WebLink
<br /> <br />Stevens Mine Annual Report <br />Permit #M-1996-064 <br />Acme Brick -Denver <br />Mining for the year 2004 remains in phase # 1. Some stockpiling of material <br />goes over onto phase #2 to the south. 2004 mining was confined to benches <br />already established in 2003. Approximately five acres have been disturbed to <br />date. Possible seeding of the north side of phase #1 could take place in 2005 <br />with the addition of overburden placement and topsoil. <br />Charles Plattlmining supervisor <br />12-06-04 <br />