Laserfiche WebLink
1 <br />1 <br /> <br /> <br /> <br />LJ <br /> <br /> <br />1 <br /> <br />1 <br />t <br />1 <br /> <br />TABLE 7A <br />BULLDOG IVQNE - CREEDE, COLORADO -LOWER TAlLlNG POND - P/EZOMETER WP-31 <br />Sample <br />Date Free Cyanide <br />(ppm) Total Lead <br />(ppm) Total Zinc <br />(ppm) Total Copper <br />(ppm) <br />7/27/82 <br />8/6/82 <br />8/ 12/82 <br />8/ 17/82 <br />8/25/82 <br />8/31/82 <br />9/J82 <O.OI <0.01 <0.01 <br />9/ 14/82 <br />9/29/82 <br />10/6/82 0.32 0.23 0.27 0.04 <br />10/18/82 <0.01 0.53 0.28 O.I3 <br />2/2183 0.07 0.26 0?2 <0.05 <br />2/28/83 0.17 0.19 0.06 <0.05 <br />3/14/83 0.13 0.11 O.Oi <0.05 <br />3/31/83 0.14 0.06 <0.05 <br />4/19/83 0.40 0.93 O.li I 0.06 <br />5/5/83 0.50 0.45 0.07 <0.05 <br />5/26/83 0.42 0.24 0.14 c0.05 <br />8/18/83'• <br />unfiltered 0.36 1.30 0.36 0.05 <br />8/18/83 <br />filtered <0.05 0.13 <0.05 <br />9/19/83 0.10 <br />9/28/83 0.41 <br />' Phaze l & 2 Remediation Work June - November 1982 <br />"Second Stage Remediation Work June -August 1983 <br />1 <br /> <br />~J <br /> <br />