Laserfiche WebLink
1 <br /> <br />1 <br /> <br />1 <br /> <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br />TABLE 6A <br />BULLDOG MINE - CREEDE, COLORADO- LOWER TAlLlNG POND - P/EZO~NETER WP-30 <br />Sample <br />Date Free Cyanide <br />(ppm) Total Lead <br />(ppm) Total Zinc <br />(ppm) ~ Total Copper <br />(ppm) <br />7/27/82 • 0.64 0.32 0.05 <br />8/6/82 0.06 0.16 0.03 <br />8/12/82 <br />6/17/82 0.37 0.17 0.02 <br />8/25/82 <br />8/31/82 <br />9/2/82 <0.01 0.17 <0.01 ~ <br />9/14/82 0.02 1.20 0.41 0.07 <br />9/29/82 2.00 0.42 0.50 O.12 <br />!0/6/82 0.25 0.37 0.22 0.07 <br />10/18/82 <0.01 0.55 0.20 0.08 <br />2/2/83 <0.01 0.17 0.09 0.02 <br />2/28/83 <0.01 0.13 0.06 <0.05 <br />3/14/83 0.01 0.21 0.10 <0.05 <br />3/31/83 0.04 0.07 <0.05 <br />4/!9!83 <O.OI 0.80 0:13 0.07 <br />5/5/83 0.02 0.54 0.14 0.08 <br />5!26/83 0.02 0.13 0.05 <0.05 <br />.. <br />unfiltered <br />0.05 <br />3.30 <br />0.24 <br />0.05 I <br />8/18/83 <br />filtered 0.08 O.I2 <0.05 <br />9/19/83 0.02 <br />9/22/63 0.02 __ <br />' Phaze I & 2 Remediation Work June -November 1982 <br />' "Second Stage Remediation Work June -August 1983 <br />1 <br />1 <br />1 <br />1 <br />