Laserfiche WebLink
PIEZOMETER INSTALLATION SKETCH <br />BORING NUMBER P-16 INSTALLED BY RLB DATE 6-30-82 <br />PIEZOMETER NO. P- 16 CHECKED BY JWN DATE 9-9-82 <br />' SAMPLE POINT N0. 29 COORDINATES N 100,334 E IIS, IIS. <br />t <br /> ~~ <br /> N <br /> <br /> <br /> <br />' I I/2" DIAMETER <br /> SCH. 40 <br /> PVC PIPE <br /> z <br /> J <br /> J <br /> <br /> O <br /> r <br /> ¢ PEA GRAVEL - <br />' H <br /> O <br /> <br /> " <br /> 4 <br />DIAMETER <br /> 80R ING - <br /> <br /> <br />' E3ENTONITE SEAL <br /> z 4.7~ SLOTTED LENGTH- <br />' (0.010~~ SLOTS) <br /> a: <br /> ~ CAP- <br /> U <br /> <br />RM82-1544 <br />CAP <br />TOP OF PIPE <br />EL. 8833. 4 <br />f~ - <br /> ~ <br />Qf <br /> v - <br /> ti N <br /> <br /> m ti <br />O <br />~ o <br />a <br />c~ <br />a <br />SAND <br />3~~ DIAM. flORING <br />Figure 12 <br />Monitoring Well-WP29 <br /> <br />