Laserfiche WebLink
<br />1 <br />' Table of Contents <br /> 1.0 Purpose and Need <br />' 2.0 Background and History <br /> 3.0 Data/Information/Assessment <br />' 3.1 Tailings Remediation Work <br />3.2 Water Monitoring <br /> a} Monitoring Wells <br /> b) Monitoring Results <br />' c) Private Wells Monitoring <br /> 4.0 Conclusions <br /> <br />Figure 1 General Location <br />Figure 2 Facility Location <br />Figures 3 - 9 Ground water monitoring data plots <br />Figure 10 Monitoring Well WP 15 Boring Log <br />Figure 11 Monitoring Well WP 29 Boring Log <br />' <br />Figure 12 Piezometer Installation Sketch- WP 29 <br />Figure 13 Piezometer Installation Sketch- WP 30 <br />' Figure 14 Piezometer Installation Sketch- WP 31 <br />Figure 15-16 D'Appolonia construction sketches from As-Built Reports <br />' Tables ] -7 Ground water monitoring results <br />Table 8 Private Well Sampling Results <br /> <br /> <br />1 <br /> <br />~J <br />1 <br />l <br />4 <br />7 <br />7 <br />8 <br />8 <br />9 <br />10 <br />12 <br />