Laserfiche WebLink
<br />RECLAMATION ANNUAL REPORT <br />• LYONS QUARRY, LYONS, COLORADO <br />PERMIT NO. M-77-208 <br />1993-1994 <br />The purpose of this repott is to comply with the Mined Land Reclamation Act of 1976, <br />Statute 34-32-112 of House Bill No. 1065. This report follows the outlined requirements found <br />in the Rules and Regulations of Colorado Mined Land Reclamation Boazd, Section 2.4, covering <br />annual reports. The permit for the Lyons Quarry was issued on June 4, 1978. <br />This report shows the areas partially reclaimed, continuing operations and the new areas <br />opened up in the 1993-1994 reporting period. Each area of the operation affected during the <br />reporting period is identified on the map. The map legend indicates the type of operation, the <br />areas included, and the total acreage for each type of operation. The individual areas are labeled <br />and the acreage of each parcel is indicated in the map. <br />The mining and stripping areas which are considered major disturbance include: area A3 <br />which includes 36.7 acres; area C1 which includes 1 acre; area C2 which includes 16.7 acres; <br />• and area C3 which includes 7.9 acres. Mining and stripping areas total 62.3 acres. Also <br />considered major disturbance are the areas where mining is completed and the areas are awaiting <br />reclamation. These areas include area A4 which includes 47.7 acres; area CS which includes 5.8 <br />acres; and area C4 which includes 1.5 acres. Mining completed and awaiting reclamation totals <br />55 acres. <br />The waste dump, equipment storage, and stockpile areas include: areas AS and A6, and <br />total 29.6 acres. These areas are considered moderate disturbance. <br />There are many areas in various stages of reclamation. Titese include areas where <br />backfilling has been completed, areas which are currently being backfilled, areas where grading <br />was completed, and areas currently being graded for reclamation during the reporting period. <br />The area where backfilling has been completed is area A2 and includes 11.8 acres. Areas <br />currently being backfilled include A7, C6, D1, B2, and E1, and total 84.9 acres. Areas that <br />were graded for reclamation include: Al and B1, and total 34.1 acres. <br />Plans for reporting period June, 1994 to June, 1995 include: completion of reclamation <br />on parcels Al and B1; grading for reclamation on parcel A2; beginning backfilling on the <br />. northern portion of A4; continuation of backfilling of parcels D1 and E1; continuation of mining. <br />