4.1.3 U iliti s <br />Location of WRNM's power line, water well, natural gas, access road and other <br />utilities are shown on Figure 2-1. The following is a description of current <br />utilities: <br />a. White River Electric Assoc. provides power to the site. The service is <br />supplied via the 2.5 mile transmission line from Horse Draw on <br />Piceance Creek to the plant site. <br />b. Project water needs continue to be met by the raw water well <br />completed in May, 1990. Water from the well is fed to the raw water <br />storage tank at the plant which has a storage capacity of 100,000 <br />• gallons (30,000 gallons of which is reserved for fire protection). The <br />water is then processed through our water softening system before <br />use as process water; either as plant water or as barren liquor <br />makeup. <br />c. The project access road was completed in May, 1991, with adouble- <br />coarse chipseal. The road is 3.2 miles long and 24 feet wide. The <br />ROW was assigned to Rio Blanco County by the BLM on December <br />13, 1991. <br />d. Potable water is provided in bottles from off-site sources. <br />e. Domestic sewage is handled by a septic tank and leach field system. <br />f. Process instrument air is provided by an on-site compressor. <br />75 <br />