Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />P.O. Boz 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245.4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />June 8, 2006 <br />Dan Mathews <br />Division of Minerals and Geology <br />101 South 3rd Suite 301 <br />Grand Junction, CO 81501 <br />Re: McClane and Munger Canyon Mines <br />Permits C-1980-004 (McClane) and C-1981-020 (Munger) <br />2005 Water Year Annual Hydrology Report <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />~~v~i~~0 <br />SUN ~ X1006 <br />dM~~1°e~d Gp0~o9Y <br />v~jD" <br />Dear Mr. Mathews: - -' ~ ` " <br />The DMG's preliminary adequacy review letter dated April 21, 2006 requested additional information. On <br />behalf of CAM MINING LLC, the following discussion and amended data are provided: <br />CAM - A goal of this adequacy response is to propose the best baseline data available for the Ground Water <br />Monitoring Wells and to integrate it into the permit and upcoming AHR's. In the groundwater section of AHR's <br />for 1986, 1987, 1988, 1989, 1990, 1991 and 1992, it states baseline data from 1986 was used. However, <br />when you review Table 5 from the same AHR's, S W L baseline year 1981 was used. Then, in water year 1993 <br />in the groundwater section, the text changes and it says baseline data from 1981 with no reference to 1986 <br />baseline data, The next AHR the operator could locate was for water year 1996 and in the groundwater <br />section it states SWL baseline data for 1981 and 1986 are used. The 1985 and 1986 (1986 WY) data were <br />collected in response to Stipulation 4 of the Central Facilities Revision for wells GW-2 through GW-8. <br />Stipulation No. 4 apparently asked for an additional year of baseline data. The operated has summarized the <br />1981 and 1986 WY data which for future reports will be used as baseline. Baseline data for GW-1 will be <br />obtained from 1983 and 1984 monitoring. The baseline data are presented on new Table 4.4i. There was no <br />activity or discharge during the1985-986 water-year, so the EC values should berepresentative ofpre-mining <br />conditions. Well GW-1 has not been affected by mining so the 1983 1984 monitoring data should be <br />acceptable for baseline conditions. <br />1. On page 5 of the AHR, CDPS Discharge Monitoring Reports are mentioned. Please amend the <br />narrative to include a brief summary addressing the occurrence and nature of any CDPS effluent <br />criteria exceedances during the water year, for any_of the discharge points. <br />CAM -Added summary addressing the occurrence and nature of effuent criteria exceedance at the <br />McClane Canyon Mine in August 2005. Please see updated pages 5 and 6. <br />2. DMG -Due to installation of Culvert P, mine water now enters East Salt Creek downstream from <br />SW-1. Coordination of SW-1 sampling concurrent with mine discharge events would provide useful <br />information, and should be conducted as practicable. <br />DMG -With regard to groundwater, we recommend that the discussion in the AHR be expanded and <br />the permit document(s) may need to be clarified or supplemented with additional information. <br />The approved monitoring program for McClane includes wells GW-1 and GW-3. The monftoring program <br />for Munger includes wells GW-1, GW-3, and GW-6. The current approved programs include quarterly <br />monitoring for freld parameters only (temperature, pN, specifrc conductance, and static water level). Six <br />alluvial wells were drilled and samples were collected forlaboratory analysis during the period December <br />1977 through April 1979. Since the time of baseline data collection, apparently no samples have been <br />collected for laboratory analysis. Field parameters only are measured for the wells in the current <br />monitoring program. We have the following specific comments regarding the presentation and analysis of <br />groundwater data. <br />