Laserfiche WebLink
<br />ANNUAL REPORT <br />INSTRUCTIONS <br /> <br />According to C.R.S. 34-32-116(3), and C.R.S. 34-32.E-I 16(3)(a), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current dismrb~mces to affected land, <br />reclamation accompi.ished to date and during the preceding year, new disturbance; that are anticipated to occur <br />during the upcomins; year, and reclamation that will be performed during the upcoming yeaz. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written repon.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(1)(a): <br />(P the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, <br />performance: standards and Environmental Protection Plan requirements, if they are pan of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regazding the sufficiency of the value of the Financial Warranty, specifically: <br />(n F'er the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />indt:pendent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these instruments. <br />The report shall also provide proof that there are no pastdue property taxes. <br />-(iii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the forrri~ <br />of a. balance sheet, certified by a Certified Public, Accountant, demonstrating that the <br />Len.er of Credit does not exceed ten percent (1090) of the bank's capital surplus accounts. - <br />' (vi) Per the requirements of 2 CCR 407-1, 407, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment,.the operator shall provide a report in sufficient <br />de[tul to fully describe the condition,,value, and location,of all pledged fixtures ' , <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information <br />required as :part of the approved permit application, to include the Environmental Protection Plan. <br />(Please note that if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Flan as part of your approved permit.) <br />