My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36643
DRMS
>
Back File Migration
>
Report
>
REP36643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:14:42 AM
Creation date
11/27/2007 7:32:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Report
Doc Date
2/2/1998
Doc Name
1997 AHR
Annual Report Year
1997
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br /> <br /> <br />1 <br />1 <br /> <br />1 <br /> <br />1 <br />1 <br /> <br />1 <br /> <br /> <br />1 <br />1 <br />1 <br /> Monitoring Sample <br />Surface Water: Plezometer No. Monitored Stretum Frequency Paameters <br />SW1-1' Crest Gage 8 Red Wash below mine Monthly = ph, cond., temperature <br /> Sampler Quarterly Full Suite (Attachment A) <br />SW11-1' Crest Gage & Sculllon Gulch below D-Portal Monthly ° ph, cond., temperature <br /> Sampler Area tuarterly Full Suite (Attachment A) <br />SW23-1' Crest Gage 8 Red Wash Tributary below Monthy' ph, cond., temperature <br /> Sampler Pond RP-1 Quarterly Full Suite (Attachment A) <br />SW24-1' Crest Gage & Red Wash above mine Monthly = ph, cond., temperature <br /> Sampler Quartery Full Suite (Attachment A) <br />SW31-1 '~ Crest Gage 8 Sculllon Gulch above LJncoln Monthly' ph, cond., temperature <br /> Sampler Reservoir Quarterly Full Suite (Attachmend A) <br />SW8-1 " Grab sample Fossil Reservdr Monthlyz ph, cond., temperature <br /> Quarterly Full Suite (Attachment A) <br />SW33-1 '~ Grab sample Raven Park Dam Monthlyz ph, cond., temperature <br /> Quarterly Full Suite (Attachment A) <br />' Water monitoring, previously discontinued, was resumed in April 1996 <br />: Sample ASAP following significant rainfall events. If samplers contain water, run full suite analysis <br />(Attachment A). If samplers are reached within two hours of rainfall event, take field parameters. Submit <br />ell sample results In the quarterly report. If a "no flow" Is reported for a given quarter, this must be <br />verified by a nest stage gage height of 0.0 for the entire quarter. <br />' All surface water monitori has been discontinued since DMG's <br />ng approval of the amendment in August 1997 (TR47). <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.