Laserfiche WebLink
iii iiiiiniiiiii iii <br />QUARTERLY INSPECTION REPORT <br />COAL WASTE BANKS <br />Rules 4.09(11) and 4.10(2)(2) <br />Date: .1L,~101 ~~1Gt LYuar~er. aDO <br />Waste Bank No: <br />General Description or Reference to Site Plan: <br />^~Golden Eagle -Exhibit 17, pages 2.05-19, 2.05-25 (a) through (c) <br />4Q New Elk -Exhibit 30, pages 2.05-27 through 2,05-44 <br />Activity During Inspection: <br />^ Removal of Topsoil at Organic Matter <br />^ Installation of Surface Drainage System <br />5p~; 1fvC: <br />^ Placement of Underdrain(si" <br />^ Revegetation ^ Construction of Fill <br />Drainage: Include discussion of springs, overland and channel flow, underdrain construction <br />and/ordischarge, integrity of 100-year 24-hourappurtenant drainage structures, evidence of positive <br />drainage. <br />~('D~~l~wa }'~~ i'hL°45tI~eM~7`S i•~oP,'cq~e 7`~~ 3 ra~•,~~~r <br />In Tl~ a43 i5 4~!-T~+ey''j~P~~,~~gY[[~b•, m7~' 7'~~ ~AQ~4rn/ so,"ls. <br />grYkc~~wt~?`i°r^ ~G'~ ~~`- Oe ~?D~1.'7'`~rP~' ~'tD O~t_°7~!'M,a r <br />i~' grat.•~~wv~r ~`s b4;1~1~,9 4~ ;., y~e r~.~~-"~r~~e,~' <br />Observations of Fill Construction: Include description of material, compaction, lift thicknesses, <br />slopes of sides and faces, construction methodology. <br />Se~~~ s~ql/ S~~P;I~s 45s~c;4~~cp k.,'7-~ cleo~;»~ <br />Ot.tf" tG ~ p.~~~ ~ ~ ~r ~`vc ~ cP~ ~s c,~'~ o~ser~ <br />~~~~f~~~`~Y <br />JUN22~f <br />Job No. 28,170 1 Page 1 of 2 <br />