Laserfiche WebLink
0 <br /> Additional Page <br /> 2000 Annual Report Fe:' 77VED <br /> Pueblo East Pit <br /> M-1986-015 NOV 13 _ 1 <br /> Transit Mix of Pueblo Division of Minerals and Geology <br /> Anniversary Date: November 12 <br /> Overview of Permit Year: Very little activity occurred at this site in the last year. For all practical <br /> purposes, there was no mining activity. The only activity was some streambank stabilization work <br /> performed with the approval of the U.S. Army Corps of Engineers. This has been going on for some <br /> time and is covered under Nationwide permits. <br /> Annual Report Maps: Included are two maps. The first map shows the current permit area. The second <br /> map shows the current permit area and the estimated area to be added in the next year through the <br /> amendment process. <br /> The current permit area map was created by placing the description and dimensional <br /> measurements of the existing permit maps on the detailed topographic map. Because the official permit <br /> map was based on a USGS topographic map with a production date in the early 1970's there were, as <br /> expected, quite a few discrepancies. These included misalignments with the river, alignments with river <br /> banks that no longer exist, and lapses into adjacent property. After including these various changes and <br /> modifying the map to best fit the current site with reference to other maps, including the original USGS <br /> base map, the boundary shown represents the best fit of all available information. There were several <br /> areas of the current permit maps and boundary descriptions that fit very closely with the new map <br /> information. The areas where there were the greatest changes were in locations where major landscape <br /> features, primarily the river bank, had changed in the nearly 30 years since the USGS map used to define <br /> the original permit was drafted. <br /> Affected Lands: No change from previous years. <br /> Revegetation: None. <br /> Expected Activity (2001): In preparation at this time is a large amendment to this permit. The area <br /> shown on Map 2 includes the land expected to be mined under the new amendment. However, the actual <br /> amendment area will extend about a mile or so upstream and downstream from the east and west ends of <br /> Map 2. Those other lands are being permitted in anticipation of possible future mining activity, but in <br /> the amendment being prepared there is not expected to be any affected land in those areas. <br /> Bonding: This operation is covered by a corporate bond. <br /> Transit Mix of Pueblo 2000 Annual Report M-1986-015 Pueblo East Pit Page 1 of 1 <br />