Laserfiche WebLink
Lambert ana ~~,~otiateo <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER M91003MT DATE Tuesday, 6/25/91 <br />PROJECT NAME West EIk Coal Mine <br />PROJECT LOCATION Somerset, CO <br />CLIENT West Elk Coal Co. <br />CONTRACTOR <br />TECHNICIAN Hayes <br />WEATHER CONDITIONS warm, calm <br />WORK REQUESTED Density tests <br />FOREMAN <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site at 2:45 p.m. as requested by Ms. Kathy Welt. <br />I performed soil moisture content and soil density tests as requested by Ms.. Welt <br />of material being placed on coal gob pile using nuclear soil density test methods. <br />Please refer to the test results sheet for approximate test locations and test <br />results. The test locations were determined by Ms. Welt of West Elk Coal Co. <br />The test results were verbally giVen'to Ms. Welt at the time of our site visit. <br />The test results indicate only the relative compaction and soil moisture content <br />of the material tested at the elevation and location tested at the time of our site <br />visit. <br />P.O. BOX 3988 P.O. BOX 0045 463 TURNER. 704 A <br />GRAND JUNCTION, CO 87502 MONTROSE. CO 87402 DURANGO, CO 81307 <br />(303) 246.6506 (303) 249.2754 (3031259.5095 <br />