Laserfiche WebLink
• Hined Land keclamation 7 December 22, 1988 <br />Slope Stability Stations at Berr #2 and Bea+~ k3 Are lied in <br />D-11-U and U-12-11 through a series of F'r"imary loops.: <br />bear #2 U 13 <br />LI 14 <br />U 15 <br />Bear #3 U 16 <br />U 17 <br />U 18; <br />U i•.+ 3 <br />U 2J 4 <br />• <br /> <br />Table 2 grid Table 5 is a list of slope stability Station= wit.hi <br />their- coordinates grid elevations from August., 1`±85, through Uc:- <br />totrer', 1`+'07 and thre resulting mean values. <br />TABLE 2 <br />SLCrPE STABILITY <br />BEAR MINE NCB. 2 <br /> Nortriing Eastirrg Elevat.ior~ <br />STATION U13 <br />August, 1'ac:5 404,387.70 1,443,503.79 0119.22 <br />July, 1980 404,390.05 1,445,503.17 E~117.5~~ <br />November-, 19..6 404,390.06 1,x43,503.11 6117.49 <br />July, 1'>'87 404,3'?0.52 1,44:,,503.12 0117.40 <br />October-, 1987 x04,390.57 1,445,503.24 c~117.58 <br />June, 1908 404,390.03 1,445,503.20 6117.7 <br />November, 19c;~ 404,390.69 1,443,503.16 0117.34 <br />MEAN 404,390.42 1,445,503.17 6117.43 = <br />STATIUN U14 <br />August, 1915 404,479.38 1,443.010.21 E•0';+0.81 <br />July, 198E• 404,479.31 1,445.010.18 60'2,9.79 <br />November, 19BE. x04,479.29 1,443.610.16 60^09.69 <br />July, 1967 404,479.42 1,443.610.35 60'0'9.63 <br />October-, 1987 a0a,479.aa 1,x43,610.34 60c^.9.E•0 <br />June, 1968 404,479.60 1,443.610.21 (;069.75 <br />November-, 192^0 404,479.46 1,443,610.53 6069.53 <br />MEAN 404,479.42 1,443.610.29 6069.69 <br />=Hewn Elevation does not include August, 1'x:;5 <br />'Monument = k5 Ret~ar <br />°Monument = Y7 Reba( in concrete <br />