• Hined Land keclamation 7 December 22, 1988
<br />Slope Stability Stations at Berr #2 and Bea+~ k3 Are lied in
<br />D-11-U and U-12-11 through a series of F'r"imary loops.:
<br />bear #2 U 13
<br />LI 14
<br />U 15
<br />Bear #3 U 16
<br />U 17
<br />U 18;
<br />U i•.+ 3
<br />U 2J 4
<br />•
<br />
<br />Table 2 grid Table 5 is a list of slope stability Station= wit.hi
<br />their- coordinates grid elevations from August., 1`±85, through Uc:-
<br />totrer', 1`+'07 and thre resulting mean values.
<br />TABLE 2
<br />SLCrPE STABILITY
<br />BEAR MINE NCB. 2
<br /> Nortriing Eastirrg Elevat.ior~
<br />STATION U13
<br />August, 1'ac:5 404,387.70 1,443,503.79 0119.22
<br />July, 1980 404,390.05 1,445,503.17 E~117.5~~
<br />November-, 19..6 404,390.06 1,x43,503.11 6117.49
<br />July, 1'>'87 404,3'?0.52 1,44:,,503.12 0117.40
<br />October-, 1987 x04,390.57 1,445,503.24 c~117.58
<br />June, 1908 404,390.03 1,445,503.20 6117.7
<br />November, 19c;~ 404,390.69 1,443,503.16 0117.34
<br />MEAN 404,390.42 1,445,503.17 6117.43 =
<br />STATIUN U14
<br />August, 1915 404,479.38 1,443.010.21 E•0';+0.81
<br />July, 198E• 404,479.31 1,445.010.18 60'2,9.79
<br />November, 19BE. x04,479.29 1,443.610.16 60^09.69
<br />July, 1967 404,479.42 1,443.610.35 60'0'9.63
<br />October-, 1987 a0a,479.aa 1,x43,610.34 60c^.9.E•0
<br />June, 1968 404,479.60 1,443.610.21 (;069.75
<br />November-, 192^0 404,479.46 1,443,610.53 6069.53
<br />MEAN 404,479.42 1,443.610.29 6069.69
<br />=Hewn Elevation does not include August, 1'x:;5
<br />'Monument = k5 Ret~ar
<br />°Monument = Y7 Reba( in concrete
<br />
|