Laserfiche WebLink
1!;~' ~ t <br />r <br />~. <br />~~~•, <br /> <br />F~ <br />r ~~ <br />,i <br />• • !;H L <br />BRUCE H. LIEN-CHAIRMAN OF ThIE BOARD <br />PETE LIEN-C.0.0. <br />COLORADO <br />~~ <br />C~~P~~9~1 Y <br />CRUSHED LIMESTONE • GYPSUM • CALCIUM FEED SUPPLE:MENT• SILICfr SAND <br />Non-Metallic Minerals A Divi:tion of Pete Lien 8 Sons <br />P.0. Box 1961 P.0. Box 440 <br />Fort Collins, CO 80522 Rapid City, SD 57709 <br />303493-6294 605342-7224 <br />Fax:303~490-1063 Fax:605~342-6979 <br />Located 19 miles North of Fort Collins near Owl Canyon <br />Mined Land Reclamation Board <br />Colorado Department of Natural Resources <br />ATTN: Ms. Kim Harville, Division of Mining and <br />Geology <br />1313 Sherman Street, Room 215 <br />Denver. CO 80203 <br />Dear Ms. Harville: <br />Located al Interstate 9D 8 Deadwood <br />RECEIVEp <br /> <br />Division of Minerls 8 Geo;ogy <br />Enclosed are the annual reports for the nine Colorado Lien quarries in Colorado, including: <br />Permit No. Name of Site <br />1. M77- Wasson Ranch <br />003HR Quarry, Creede <br />2. M77- Munroe Gypsum <br />002HR Quarry <br />General status <br />Site now reclaimed and awaiting vegetation growth to <br />request release. No map included. <br />Extraction in newly affected areas is done in one or two <br />campaigns a year. See map and report. <br />3. M77-093 Newett Quarry, Currently drawing from stockpiles on site. No new <br />Buena Vista extraction, disturbance or reclamation this year, but new <br />fences and gates have been installed to improve access <br />control. No map. <br />4. M77-301 Roberts Quarry Technical revision to change mining sequence approved for <br />this year. We did extensive extraction and ladditional <br />acreage was affected this year. Based on the new mapping <br />the areas of pre-74 and post-74 affected lands have been <br />changed from that previously reported. See map and <br />report. This site has several pre-74 affected areas. <br />5. M77-302 Owl Canyon Quarry Technical revision to clarify permit mining and reclamation <br />approved for this year. Continued extraction (in previously <br />affected and new areas) and reclamation. During the year <br />we worked with the Division on bonding and modifications <br />to reclamation plan, and to accurately identify the affected <br />areas. New mapping caused us to revise altected areas els <br />shown in the report and map: we had been reporting much <br />more area affected than has actually been affected. New <br />areas were affected by extraction this year. Tracts A, B, (: <br />and the road have been removed from this report and are <br />now being reported as part of Rex Quarry, CIS per <br />conversations with the Division and the clarified mining <br />plan. <br />