My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36419
DRMS
>
Back File Migration
>
Report
>
REP36419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:14:13 AM
Creation date
11/27/2007 7:27:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
7/9/1981
Doc Name
Geotechnical Site Evaluation for Proposed Surface Facilities
From
Chen and Associates
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />- 15 - <br /> <br />1 <br /> <br />1 <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />1 <br /> <br /> <br />1 <br />1 <br />Slope Protection: The on-site clays and fine sands and silts are <br />susceptible to water erosion. Therefore, slopes and channels <br />subjected to beach or stream type action will require protection. <br />Several types of protection are possible. Riprapping can be used but <br />due to the large difference between gradation of the fine rained <br />c~nbanlarent materials and riprap, use of a filter ted or fabric below <br />the riprap will be required as a transition. Well cemented sandstone <br />excavated from the steep slope along the haul road would be a poten- <br />tial source of riprap. A suitable riprap bedding material may be <br />obtainable from granular borrow along the river; however, processing <br />the material to proper gradation will be required. If water level <br />fluctuation is confined to a relatively narrow range, partial pcotec- <br />tion of the slope can be provided. For this case, a minimum 10 foot <br />wide bench should be provided at the toe of the riprap. <br />We understand that spillways through the embanlonent will also be <br />provided. Due to the erodibility of the on-site fine rained soils in <br />their natural as well as co;~acted condition, the spillway should be <br />protected by use of riprap, slope mattress, grasses, etc. Protection <br />should be adequate to prevent head cutting of the channel into the <br />reservoir. Well Demented sandstone material could also be used for <br />energy dissipaters. If water velocities are below erosion levels or <br />periodic repair of spillways is conducted after periods of flow, the <br />riprap can be eliminated. <br />Instrumentation: Instrumentation in the form of settlement ~ronuments <br />and open end observati~ wells should be provided to evaluate the <br />performance of the structures during operation. We recommend a <br />reference point monument be provided near maximum section on the crest <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.