My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP36343
DRMS
>
Back File Migration
>
Report
>
REP36343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:14:09 AM
Creation date
11/27/2007 7:25:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
10/22/1980
Doc Name
ROADSIDE REFUSE PILE FN 77-442
From
JIM HERRON RECLAMATION SPECIALIST
To
GEX COLORADO INC
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO RiC N•vRn D L~Gnvem n. <br />DEPARTMENT OF NATURAL RESOURCES <br />Harris D. Sherman. Ezecurive Director <br />ML~IED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 839-3567 <br />David C. Shelton <br />Director <br />October 16, 1980 <br />TO: Jim Herron <br />Fred Banta <br />FROM: Tim Pendleton <br />RE: Certification the Sta lity of the Refuse Pile at GEX's Roadside <br />Mine <br />With the receipt of the attached letter by Gordon Bruckner, consultant <br />for GEX Colorado, Inc., I accept GEX's certification of the structural <br />stability of the refuse pile at the Roadside Mine in Cameo, Colorado. <br />However, two steps remain to be completed in finalizing the refuse pile's <br />certification. (1) The non-toxic cover design needs to be completed <br />and submitted for approval. I expect this design to specifically discuss <br />the topic of assuring surficial stability in those areas of the refuse <br />pile now evidencing seepage or high moisture conditions. This design <br />must be prepared by an appropriately qualified registered professional <br />engineer. (2) The on-going inspection program for the refuse pile must <br />be continued to its completion. The final inspection should be completed <br />and a report submitted which certifies that the pile was constructed in <br />conformance with the approved design. <br />/k <br />attachment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.