Laserfiche WebLink
• • Over what period <br /> C. Watering <br /> V. LValuation of Success <br /> a. Meat areas need additional backfilling? <br /> b. Mat areas need additional shaping? <br /> C. Mat areas need additional planting? <br /> Vi. Plan for the following year <br /> a' Mining Current plan Permit Previous Report <br /> Specification <br /> � Projection <br /> 1• f Acres to be <br /> stripped <br /> locations <br /> ` 2. 0 Acres to be <br /> excavated 8 acres (see mao) <br /> Locations <br /> b. Reclamation <br /> Acres to be <br /> backfilled <br /> Locations <br /> _ o ' <br /> 2. Acres to be <br /> graded <br /> Locations <br /> y <br />